This content is provided by a third party. In order to see the content, we need the following consent from you: Marketing
Cookie-Settings

Welcome to layher

The Layher name has been synonymous with high-quality scaffolding systems, outstanding service and dependable partnership for more than seven decades now. Even today, development, production, logistics and management are still all in one place, where the conditions are best for achieving “Quality Made By Layher”: in Güglingen-Eibensbach. At two locations, over an area of 318,000 m², we produce our pioneering system scaffolding using highly automated methods. Our deep roots in the region, and a culture of service and innovation we’ve lived by for generations, form the basis for our promise to customers all over the world: “More possibilities!”
            
                      
                     

CONTINUAL PRODUCT INNOVATIONS
COMPLIANCE WITH THE LATEST LAWS AND REGULATIONS
RAPID MATERIAL AVAILABILTY
CLOSE-KNIT NETWORK OF SERVICE POINTS
EXPERT ASSEMBLERS AND TECHNICAL ASSISTANCE AT THE CONSTRUCTION SITE
As leading innovators, we work continually to make scaffolding construction even simpler, even faster and above all even safer with our products. The development work focuses on: improving safety during assembly and dismantling, increase in assembly capacity thanks to lower weight, more ergonomic shape and reduced number of components, increase in efficiency and profitability, complete integratability of new products into existing system and opening up of new fields of business with new products.
Risk assessments and the measures derived from this for protection against falls during assembly and dismantling are brought into focus more and more. For compliance with this and with further safety guidelines, Layher has devised a range of temporary and also system-integrated solutions for collective protection.
Layher can draw on flexible production resources and significant inventories, and so can guarantee customers uniquely fast delivery at all times. We can deliver dependably and punctually for orders placed worldwide. “No time to lose" is also the motto of our logistics concept: customers can collect the materials they need from their Layher service centre, have them sent to their warehouse, or delivered just-in-time to the site. This means they can start work without delay and complete their projects efficiently while maintaining the original top quality.
A worldwide network of subsidiary companies ensures that we are always close to our customers. You can rely on our Layher standards wherever you are in the world: local warehouses, technical support, training in accordance with national regulations and safety standards. The benefits for you: We can respond optimally to market-specific needs, because we know the local conditions, cultural characteristics and of course each country’s specific regulations. This makes us competent partners, for internationally operating companies too.
Our priority is our customers’ success. This is why we believe in close cooperation, and invest in genuine and lasting partnerships at every level. Our well-qualified engineers devote themselves to your specific requirements, finding solutions for you that deliver the right results at the right price – including directly on the site. It may be that new applications have to be tried out or assistance is needed when assembling Layher scaffolding for the first time. Expert assemblers are there to assist you and your employees – at your site too.

STRONG PARTNERSHIP

     
At Layher we're convinced that close and trusting cooperation between manufacturer, scaffolding company and end customer is the right model to ensure success when working on construction sites and projects. Only with this strategic partnership can jointly defined objectives be achieved economically and more safely. Because it’s not enough to have an outstanding product for successful scaffolding construction – what’s crucial is what you do with it.

LAYHER IS ACTIVE IN YOUR INDUSTRY TOO

OIL AND GAS

CHEMICALS

PULP AND PAPER INDUSTRY

MINING AND RAW MATERIALS

ONSHORE / OFFSHORE

SHIPBUILDING

ENERGY INDUSTRY

CEMENT INDUSTRY

AIRCRAFT MAINTANANCE

The future in scaffolding construction is digital – and its name is SIM

Scaffolding Information Modeling – SIM for short – is a process based on 3D models and designed by Layher to meet the specific requirements of scaffolding construction. SIM not only allows you to plan, assemble and manage temporary scaffolding structures more efficiently.

  • Planning and scheduling certainty at every site.
  • Reducing shutdown times
  • Increase in safety and in profitability for every project.
  • Transparency in all work steps and cost control.

Scaffolding Information Modeling

Solutions

Fire SAFETY, Wood-free Solutions

Reduction of the fire risk is a requirement frequently expressed for scaffolding in refineries, chemical factories and other fire-sensitive industrial plant. Components made of wood can be ruled out for obvious reasons. Layher has the optimum alternatives: system decks and matching toe boards made of steel or aluminium. Gap solutions made of steel, and scaffolding coverings made of low-inflammability tarpaulins or the Protect System, round off the range.
       
Solution-oriented components
      
  • Steel deck LW
  • Stalu deck
  • Toe boards of steel and aluminium
  • Steel plank
              

Safer and flat work areas – optimised for the job to be done

Since no plant is like another, scaffolding systems have to be flexible and adaptable. With Layher scaffolding, that’s no problem: Thanks to the option of laying the decks over the rosettes, a gap-free solution can generally used without additional expense or effort. For special cases specific to the site, we offer a comprehensive portfolio of expansion parts for achieving completely closed work surfaces within the system. 
 
Solution-oriented components
  
  • Special decks
  • Penetrations with interchangeable ledgers
  • Telescoping scaffolding decks
  • Telescopic gap deck
  • Gap deck
  • Steel gap cover
  • Steel plank
      

Accesses

Well-designed and correctly arranged accesses improve efficiency and also productivity at the site. 
   
Solution-oriented components
     
  • Internal ladder access
  • Platform stairs
  • Stairtowers 200, 500 and 750
        

Suspended scaffolding solutions

When the work areas are very high up, standard scaffolding structures can often be uneconomical due to high material and labour costs. With Allround Scaffolding, suspended solutions can be achieved without any problem in such cases. Pull-resistant securing of the standards with hinged pins or by bolting them together allows forces to be optimally transmitted.
    
Solution-oriented components
    
  • Suspended scaffolding structures
  • Suspended scaffolding accessories
  • Cantilevering and crane movability
         

Circular scaffolding

Closing the gaps in round equipment is often a challenge. Covering with steel or wood planks can be classified as a risk of tripping. In addition, these must be protected against unintentional lifting and slipping, which can cause problems depending on the type of soil used.
  
Solution-oriented components
   
  • Flexible angle selection of Allround rosette
  • Work surface adaptation for circular scaffolding
      

Bridging

Small spans are possible with Allround Scaffolding without the use of additional components, using standards, ledgers and diagonal braces as a lattice structure.
    
Solution-oriented components
         
  • Allround Scaffolding standard parts
  • Lattice beams
  • Aluminium FlexBeam
  • Allround FW System
  • Allround Bridging System
             

Crane movability

The high fitting precision in the Layher system enables scaffolding structures to be preassembled on the ground, complete or in individual segments. Thanks to pull-resistant connection of all individual parts, they can be moved quickly and easily into position using a crane. This is a major advantage when it comes to efficiency and profitability. At the same time, safety during assembly increases many times over. Because the best fall protection is when there is no risk of falls in the first place.

     
Solution-oriented components
                

  • Stairtowers
  • Work Scaffolding
  • Bridging
          

Rolling towers


       
Solution-oriented components
                  
  • Allround Scaffolding
  • Uni Rolling Towers / SoloTower
          

Roofs and wall systems

The extensive Layher range of protective systems extends from compact weather protection roofs to wide-span roof solutions and enclosure systems which can be kept at a lower pressure. 
        
Solution-oriented components
                  
  • Roof Systems
  • Wall systems
                

Shoring

Shoring structures are an important factor in ensuring more safety and efficiency for in-situ concreting work, particularly when building new plant. 
   
Solution-oriented components
              
  • New plant construction with Allround Shoring TG 60
  • New plant construction with Allround Scaffolding
               

Fire SAFETY, Wood-free Solutions

Reduction of the fire risk is a requirement frequently expressed for scaffolding in refineries, chemical factories and other fire-sensitive industrial plant. Components made of wood can be ruled out for obvious reasons. Layher has the optimum alternatives: system decks and matching toe boards made of steel or aluminium. Gap solutions made of steel, and scaffolding coverings made of low-inflammability tarpaulins or the Protect System, round off the range.
       
Solution-oriented components
      
  • Steel deck LW
  • Stalu deck
  • Toe boards of steel and aluminium
  • Steel plank
              

Safer and flat work areas – optimised for the job to be done

Since no plant is like another, scaffolding systems have to be flexible and adaptable. With Layher scaffolding, that’s no problem: Thanks to the option of laying the decks over the rosettes, a gap-free solution can generally used without additional expense or effort. For special cases specific to the site, we offer a comprehensive portfolio of expansion parts for achieving completely closed work surfaces within the system. 
 
Solution-oriented components
  
  • Special decks
  • Penetrations with interchangeable ledgers
  • Telescoping scaffolding decks
  • Telescopic gap deck
  • Gap deck
  • Steel gap cover
  • Steel plank
      

Accesses

Well-designed and correctly arranged accesses improve efficiency and also productivity at the site. 
   
Solution-oriented components
     
  • Internal ladder access
  • Platform stairs
  • Stairtowers 200, 500 and 750
        

Suspended scaffolding solutions

When the work areas are very high up, standard scaffolding structures can often be uneconomical due to high material and labour costs. With Allround Scaffolding, suspended solutions can be achieved without any problem in such cases. Pull-resistant securing of the standards with hinged pins or by bolting them together allows forces to be optimally transmitted.
    
Solution-oriented components
    
  • Suspended scaffolding structures
  • Suspended scaffolding accessories
  • Cantilevering and crane movability
         

Circular scaffolding

Closing the gaps in round equipment is often a challenge. Covering with steel or wood planks can be classified as a risk of tripping. In addition, these must be protected against unintentional lifting and slipping, which can cause problems depending on the type of soil used.
  
Solution-oriented components
   
  • Flexible angle selection of Allround rosette
  • Work surface adaptation for circular scaffolding
      

Bridging

Small spans are possible with Allround Scaffolding without the use of additional components, using standards, ledgers and diagonal braces as a lattice structure.
    
Solution-oriented components
         
  • Allround Scaffolding standard parts
  • Lattice beams
  • Aluminium FlexBeam
  • Allround FW System
  • Allround Bridging System
             

Crane movability

The high fitting precision in the Layher system enables scaffolding structures to be preassembled on the ground, complete or in individual segments. Thanks to pull-resistant connection of all individual parts, they can be moved quickly and easily into position using a crane. This is a major advantage when it comes to efficiency and profitability. At the same time, safety during assembly increases many times over. Because the best fall protection is when there is no risk of falls in the first place.

     
Solution-oriented components
                

  • Stairtowers
  • Work Scaffolding
  • Bridging
          

Rolling towers


       
Solution-oriented components
                  
  • Allround Scaffolding
  • Uni Rolling Towers / SoloTower
          

Roofs and wall systems

The extensive Layher range of protective systems extends from compact weather protection roofs to wide-span roof solutions and enclosure systems which can be kept at a lower pressure. 
        
Solution-oriented components
                  
  • Roof Systems
  • Wall systems
                

Shoring

Shoring structures are an important factor in ensuring more safety and efficiency for in-situ concreting work, particularly when building new plant. 
   
Solution-oriented components
              
  • New plant construction with Allround Shoring TG 60
  • New plant construction with Allround Scaffolding
               

Safety and documentation

QUALITY MANAGEMENT

Layher processes some 30,000 kilometres of steel tube every year – and we take responsibility for the safety of our customers with every single metre. This is why one of Layher’s core tasks is quality management.

MONITORING

To comply with the quality requirements and the legal basis for high-grade Layher products, they are routinely monitored with both in-house and external inspection measures.

APPROVALS

Layher scaffolding systems have national approvals in a variety of countries – for maximum safety at work and safety under the law.

WELDING TECHNOLOGY

Layher is a certified company for welding technology. We process our products on the latest welding equipment and with welding robots.

TRIAL AND TEST STAND

Before they come onto the market, all products are thoroughly tested on Layher’s up-to-date test stand. This can involve the simulation of thousands of load cycles, and drop tests are conducted too. These drop tests have to be passed by all scaffolding decks before they can be used in brick guards

TECHNICAL DOCUMENTATION

For planning certainty, extensive technical documentation is available for Layher scaffolding systems: approvals, type test for lattice beams, instruction for assembly and use, structural data sheets and comprehensive technical brochures with load capacity tables.

SUSTAINABILITY

We have always acted with great awareness and attention to economic and ecological sustainability, both in our products and in our processes. We are also focused on our social responsibility towards employees, clients and society as a whole.

Success stories

Our customers are the best proof of how our solutions can be successful. That is why the success stories tell of our customers. Look forward to exciting projects, interesting background information and exclusive insights into the history of family businesses - and how they are successfully developing on the market with Layher scaffolding systems. Because your success is our goal.
         

CONTACT US AND LEARN MORE ABOUT INDUSTRY